{"id":28450,"date":"2022-05-09T23:22:22","date_gmt":"2022-05-10T02:22:22","guid":{"rendered":"https:\/\/thelaker.ca\/?p=28450"},"modified":"2022-05-09T23:22:22","modified_gmt":"2022-05-10T02:22:22","slug":"water-main-extension-work-begins-on-windgate-drive-next-month","status":"publish","type":"post","link":"https:\/\/staging-z.thelaker.ca\/?p=28450","title":{"rendered":"Water main extension work begins on Windgate Drive next month"},"content":{"rendered":"\n<p>[adrotate banner=&#8221;164&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;93&#8243;]<\/p>\n\n\n\n<p><strong>WINDSOR JUNCTION<\/strong>: Starting next month, work will begin on behalf of Halifax Water on extending the water main along Windgate Drive up into Capilano Estates.<\/p>\n\n\n\n<p>The news was relayed in a release posted on Councillor Cathy Deagle Gammon\u2019s Facebook page.<\/p>\n\n\n\n<p>Dexter Constriction will be doing the work.<\/p>\n\n\n\n<p>The work will be done along Windgate Drive from Rivendale Drive to Ashlea Drive on behalf of Halifax Water.<\/p>\n\n\n\n<p>[adrotate banner=&#8221;84&#8243;]<\/p>\n\n\n\n<p>[adrotate group=&#8221;6&#8243;]<\/p>\n\n\n\n<p>This project is divided into two phases:<\/p>\n\n\n\n<p>\u2022 Phase 1 will take place from Rivendale Drive to Terry Road. Phase 1 pipework is anticipated to be complete in July\/August 2022.<\/p>\n\n\n\n<p>\u2022 Phase 2 will take place from Terry Road to Ashlea Drive. Phase 2 pipework is anticipated to be complete by August\/September 2022. Asphalt reinstatement for Phase 1 and 2 is anticipated to be complete in September\/October 2022.<\/p>\n\n\n\n<p>From June to September, construction will take place from 7 a.m. to 7 p.m. on weekdays. There will be one lane of traffic maintained with stop-and-go traffic in the work zone during these hours.<\/p>\n\n\n\n<p>\u00a0Weekend work will be completed as needed.<\/p>\n\n\n\n<p>[adrotate banner=&#8221;31&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;148&#8243;]<\/p>\n\n\n\n<p>Work being completed after September 3, 2022, will be restricted to occur between 9 a.m. to 4:00 p.m..<\/p>\n\n\n\n<p>This Halifax Water project is funded through capital budget planning. Halifax Water is the main point of contact for all aspects of the work.<\/p>\n\n\n\n<p>The project will improve water distribution system interconnectivity and create an additional water supply feed for the Fall River, Lower Sackville, and Waverley areas. <\/p>\n\n\n\n<p>[adrotate group=&#8221;7&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;161&#8243;]<\/p>\n\n\n\n<p>The project was planned to be completed in 2021 but was deferred due to supply chain issues and long delivery time for pipe fittings.<\/p>\n\n\n\n<p>As part of this project, Halifax Water will also be replacing driveway culverts and cross culverts that are impacted by the excavation on the shoulder of the road.<\/p>\n\n\n\n<p>To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area.<\/p>\n\n\n\n<p>Learn more: <a href=\"http:\/\/halifaxwater.ca\/project\/windgate-drive-water-main-extension?fbclid=IwAR0zReM7PqaKInCAMbt2JrP5WK6nvmA5QjiA9CuU7L2Kd67LmohZw2Gf49c\" target=\"_blank\" rel=\"noreferrer noopener\"><\/a><\/p>\n\n\n\n<p><a href=\"http:\/\/halifaxwater.ca\/project\/windgate-drive-water-main-extension?fbclid=IwAR0zReM7PqaKInCAMbt2JrP5WK6nvmA5QjiA9CuU7L2Kd67LmohZw2Gf49c\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/halifaxwater.ca\/&#8230;\/windgate-drive-water-main&#8230;<\/a><\/p>\n\n\n\n<p>[adrotate banner=&#8221;123&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;34&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[adrotate banner=&#8221;164&#8243;] [adrotate banner=&#8221;93&#8243;] WINDSOR JUNCTION: Starting next month, work will begin on behalf of Halifax Water on extending the water main along Windgate Drive up into Capilano Estates. The news was relayed in a release posted on Councillor Cathy Deagle Gammon\u2019s Facebook page. Dexter Constriction will be doing the work. The work will be [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":28451,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,957],"tags":[3662,45,3663,1760,40],"class_list":["post-28450","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-news","tag-capilano-estates","tag-halifax-water","tag-water-main-extension","tag-windgate-drive","tag-windsor-junction"],"_links":{"self":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts\/28450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=28450"}],"version-history":[{"count":0,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts\/28450\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=28450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=28450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=28450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}