{"id":41521,"date":"2023-12-20T08:30:00","date_gmt":"2023-12-20T12:30:00","guid":{"rendered":"https:\/\/thelaker.ca\/?p=41521"},"modified":"2023-12-20T08:30:00","modified_gmt":"2023-12-20T12:30:00","slug":"aerotech-connector-expected-to-be-complete-by-2024-construction-season-end","status":"publish","type":"post","link":"https:\/\/staging-z.thelaker.ca\/?p=41521","title":{"rendered":"Aerotech Connector expected to be complete by 2024 construction season end"},"content":{"rendered":"\n<p>[adrotate banner=&#8221;93&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;169&#8243;]<\/p>\n\n\n\n<p><strong>WELLINGTON<\/strong>: The contractor doing the Aerotech Connector has had some weather-related setbacks, a provincial spokesman told The Laker News.<\/p>\n\n\n\n<p>In an interview on Dec. 18, Gary Andrea with the Department of Public Works, said during the summer the contractor at the project in Wellington had some delays.<\/p>\n\n\n\n<p>\u201cThe contractor has been actively working to make up for lost time in the subgrade construction,\u201d said Andrea.<\/p>\n\n\n\n<p><strong>ADVERTISEMENT:<\/strong><\/p>\n\n\n\n<p>[adrotate banner=&#8221;71&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;127&#8243;]<\/p>\n\n\n\n<p>He was asked for a timeline on when construction is expected to be completed and the Connector between Wellington and Halifax Stanfield Airport\/Aerotech Park would open.<\/p>\n\n\n\n<p>\u201cThe Aerotech project is scheduled to end at the end of the construction season in 2024,\u201d he said.<\/p>\n\n\n\n<p>The project was included in the province\u2019s five-year highway improvement plan, released on Dec. 14.<\/p>\n\n\n\n<p><strong>ADVERTISEMENT:<\/strong><\/p>\n\n\n\n<p>[adrotate banner=&#8221;192&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;31&#8243;]<\/p>\n\n\n\n<p>Others also mentioned included:<\/p>\n\n\n\n<p>Construction on the following major projects will continue:<\/p>\n\n\n\n<p>Highway 101 from Three Mile Plains to Falmouth<\/p>\n\n\n\n<p>Highway 103 from Tantallon to Hubbards<\/p>\n\n\n\n<p>the Bridgewater Interchange<\/p>\n\n\n\n<p>the Highway 107 Sackville-Bedford-Burnside Connector.<\/p>\n\n\n\n<p>[adrotate banner=&#8221;105&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;188&#8243;]<\/p>\n\n\n\n<p>[adrotate banner=&#8221;34&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[adrotate banner=&#8221;93&#8243;] [adrotate banner=&#8221;169&#8243;] WELLINGTON: The contractor doing the Aerotech Connector has had some weather-related setbacks, a provincial spokesman told The Laker News. In an interview on Dec. 18, Gary Andrea with the Department of Public Works, said during the summer the contractor at the project in Wellington had some delays. \u201cThe contractor has been [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":39752,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,957],"tags":[212,727,121,143,442],"class_list":["post-41521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-news","tag-aerotech-connector","tag-construction","tag-hrm","tag-wellington","tag-wellington-connector"],"_links":{"self":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts\/41521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=41521"}],"version-history":[{"count":0,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts\/41521\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/media\/39752"}],"wp:attachment":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=41521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=41521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=41521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}