{"id":62579,"date":"2026-02-22T19:16:03","date_gmt":"2026-02-22T23:16:03","guid":{"rendered":"https:\/\/thelaker.ca\/?p=62579"},"modified":"2026-02-22T19:16:03","modified_gmt":"2026-02-22T23:16:03","slug":"nova-scotia-power-activating-emergency-operations-centre","status":"publish","type":"post","link":"https:\/\/staging-z.thelaker.ca\/?p=62579","title":{"rendered":"Nova Scotia Power activating Emergency Operations Centre"},"content":{"rendered":"\n<div class=\"alignnormal\">[metaslider id=&#8221;56501&#8243;]<\/div>\n\n\n\n<p><strong>HALIFAX:<\/strong> Officials with N.S. Power said the utility is activating its Emergency Operations Centre (EOC) at 8 a.m. (Monday, February 23) ahead of the next winter storm. <\/p>\n\n\n\n<p>Heavy snow and high winds are expected to impact the province throughout the day.<\/p>\n\n\n\n<p>\u201cWe\u2019ve been monitoring the forecasts and have crews positioned across Nova Scotia ready to respond in the event of outages,\u201d said Charlene MacMullin, Nova Scotia Power Storm Lead.<\/p>\n\n\n\n<p>This mix of weather can impact the power system by weighing down trees and branches on power lines. <\/p>\n\n\n\n<p><strong>ADVERTISEMENT:<\/strong><\/p>\n\n\n\n<div class=\"alignnormal\">[metaslider id=&#8221;56526&#8243;]<\/div>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"alignnormal\">[metaslider id=&#8221;56179&#8243;]<\/div>\n\n\n\n<p>The high winds can also create unsafe working conditions for power line technicians, slowing restoration efforts when they reach 80km an hour.<\/p>\n\n\n\n<p>\u201cThe Emergency Operations Centre (EOC) brings employees from all parts of the company together in one place to coordinate our storm response,\u201d said MacMullin. <\/p>\n\n\n\n<p>The team will also be working closely with the Nova Scotia Emergency Management Office (EMO).\u201d<\/p>\n\n\n\n<p><strong>Outage Information<\/strong><\/p>\n\n\n\n<p>NSP said they do their best to give an estimate of when the power will be restored and once our crews get to the site and assess what\u2019s going on those estimates are updated. <\/p>\n\n\n\n<p>Customers can report outages and get the latest<br>information and estimated restoration times online at outagemap.nspower.ca or by calling 1-877-428-<br>6004.<\/p>\n\n\n\n<p><strong>ADVERTISEMENT:<\/strong><\/p>\n\n\n\n<div class=\"alignnormal\">[metaslider id=&#8221;56506&#8243;]<\/div>\n\n\n\n<p><strong>QUICK FACTS<\/strong><\/p>\n\n\n\n<p>High winds can bring trees and branches down onto power lines.<\/p>\n\n\n\n<p>When wind reaches 80km an hour, it isn\u2019t safe for power line technicians to work from the buckets.<\/p>\n\n\n\n<p>Heavy, wet snow can weigh down trees and branches causing them to come into contact with power<br>lines; break poles and\/or damage equipment.<\/p>\n\n\n\n<p>If a customer\u2019s electrical equipment is damaged &#8211; such as a meter mast \u2013 they\u2019ll need a certified<br>electrician to make repairs before Nova Scotia Power crews can safely restore power.<\/p>\n\n\n\n<div class=\"alignnormal\">[metaslider id=&#8221;56530&#8243;]<\/div>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"alignnormal\">[metaslider id=&#8221;56191&#8243;]<\/div>\n","protected":false},"excerpt":{"rendered":"<p>HALIFAX: Officials with N.S. Power said the utility is activating its Emergency Operations Centre (EOC) at 8 a.m. (Monday, February 23) ahead of the next winter storm. Heavy snow and high winds are expected to impact the province throughout the day. \u201cWe\u2019ve been monitoring the forecasts and have crews positioned across Nova Scotia ready to [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":62581,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,957],"tags":[5814,5959,50,260,4336,237,1817],"class_list":["post-62579","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-news","tag-nsstorm","tag-emergency-operations-centre","tag-halifax","tag-n-s-power","tag-nova-scotia-power","tag-storm","tag-winter-storm"],"_links":{"self":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts\/62579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=62579"}],"version-history":[{"count":0,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/posts\/62579\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=\/wp\/v2\/media\/62581"}],"wp:attachment":[{"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=62579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=62579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging-z.thelaker.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=62579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}