Street upgrades coming to Wellington area

Streets in Wellington will get construction done in the 2025 season. (HRM/submitted photo)

[adrotate banner=”238″]

[adrotate banner=”127″]

WELLINGTON: Residents in Wellington are being advised of several street upgrades that are planned for the 2025 construction season in the community.

The lists and info had been posted on Councillor Cathy Deagle Gammon’s Facebook page.

The project areas include:

Collins Drive, Carlheath Drive, Anthony Avenue, and Lawrence Place.

ADVERTISEMENT:

[adrotate banner=”31″]

[adrotate banner=”105″]

Planned Work Includes:

• New paving, curbs, and gravel shoulders

• Watermain and catch basin replacements

• Stormwater culvert installation near Civic #29

• Speed tables on Carlheath Drive as part of HRM’s traffic calming program

There may be temporary impacts to driveway and on-street parking. Residents will receive advance notice before construction begins.

ADVERTISEMENT:

[adrotate banner=”237″]

[adrotate banner=”126″]

[adrotate group=”6″]

Learn More:

View speed table locations and get more information at halifax.ca/trafficcalming.

You can also scan the QR code in the attached graphic.

Residents are reminded to remove any personal property (fences, gardens, etc.) from the street right-of-way prior to construction.

If you have accessibility needs, underground systems, or upcoming projects requiring street access, please contact 311 to coordinate.

[adrotate banner=”192″]

[adrotate banner=”148″]