[metaslider id=”56179″]
BEDFORD: HRM is advising users of the Bedford-Sackville Greenway Connector that part of it will be closed.
It is expected to be closed for two weeks beginning Jan. 5 and running until Jan. 19.
The closure is of the pedestrian bridges that cross Sackville River and run parallel to Bedford Bypass.
It will be a 24/7 closure.
The closure is needed to facilitate the replacement of a fence on the trail near the rifle range.
[metaslider id=”56530″]
